183. Lay Flat, Please Let Me Go! (Fourth Update!)
183. Lay Flat, Please Let Me Go! (Fourth Update!)
It took about two days.
The entire structure of the house was dismantled.
All non-load bearing walls in the way were also removed.
following.
That is, more problems inside the house were exposed.
The first is the aging of the walls.
The wall of the house in the east is often exposed to wind and rain.
The entire wall structure shows signs of erosion.
This is not good news.
If the entire wall is severely eroded, the entire building will become dangerous.
Not only that, if you want to renovate, you have to demolish the entire structure of the drawing.
Luckily the corrosion isn't that bad right now - serious.
It happened to be discovered by Li Yueming in time again.
After discussion between the construction team and Li Yueming.
A group of people decided to install a steel structure inside the house.
And paint a special rainproof and waterproof paint on the facade of the wall.
Then use special spray to strengthen the hardness of the wall surface.
In this way, although there is no way to directly repair the house.
But it can be regarded as preventing the house from continuing to age.
The waterproof paint on the exterior can be used for ten years.
After ten years, another layer can be applied for another ten years.
A special spray that strengthens the surface of the walls makes them less vulnerable to rain.
The steel structure inside the wall is the last line of defense.
Even if the walls show signs of aging, the steel structure can support the main body of the column house.
This is Li Yueming's favorite technique.
Three layers of protection to ensure nothing goes wrong.
As for why not repair it directly.
Naturally, it was because the scope of construction required was too large and the budget of Yan Aunt's family was not enough.
And more importantly, the situation of rain erosion is not too serious.
The time has not come for a big start.
besides.
when demolishing the wall.
Li Yueming found that the drainage of the house still had serious problems.
All drainage from the house is connected to a single sewer pipe.
If want to build a new bathroom and toilet on the second floor.
Then where this downpipe should be connected becomes a new problem.
It is the most common practice to directly connect to the bathroom on the first floor.
But doing so, Li Yueming felt that it would cause excessive sewage pressure on the sewer pipes.
At that time, what is a little more troublesome problem.
Like clogged sewers.
It will cause the entire house to have no other place to discharge sewage.
Therefore, after careful planning by Li Yueming.
Another sewer pipe was connected on the second floor to the municipal sewage pipe downstairs.
Problems were found out one by one.
Then they were dealt with one by one by Li Yueming.
In the blink of an eye, the days passed.
During this time, the overall structure of the entire old house has been given a new division.
The only difference is the interior soft and hard decoration.
In the live broadcast room, although many viewers were already psychologically prepared.
However, Li Yueming's construction progress is still somewhat astonishing.
"I'm a turtle, Mr. Li, this is too fast!"
"It's only been fifteen days, and the interior structure of the whole house is almost finished!"
"Other designers are just starting to remodel now!"
"It seems that Mr. Li will deal a dimensionality reduction blow to other designers in terms of speed this time!"
"I just don't know how the house will look after the actual decoration."
"Mr. Li performed the operation himself, is there any doubt about that?"
"That's right, Mr. Li personally performed the operation, the transformation effect will definitely exceed our imagination!"
"Yueming big brother, forever god!"
"I feel that Mr. Li is really a freak, and he is too skilled to do things on the construction site!"
"Even the workers are no match for him!"
"Ms. Li: I didn't expect that, I am a multi-professional!
In the live broadcast room, many viewers were all amazed.
The speed of transformation of Li Yueming.
They are still very convinced.
It is advancing every day, almost visible to the naked eye.
Other designers may have to think for hours when they encounter a difficult problem.
When Li Yueming encounters a problem, he will immediately discuss it with the construction team on the front line.
Aim for an hour or so to hammer out an answer to a solvable problem.
During this process.
Li Yueming's rich basic knowledge, sharp thinking, and quick decision-making are all top-notch!
This kind of resolute performance alone has shocked many viewers!
Basically, there are very few questions that bother Li Yueming for more than an hour.
It is precisely because of such an efficient working mode.
The current construction progress of Li Yueming has left a long distance from other designers.
The construction time for the third round of reconstruction should be thirty days.
But the construction time Li Yueming gave himself was about 20 days.
A full ten days in advance.
Other designers are still using 30 days as the construction deadline.
The gap in construction progress between the two is naturally conceivable.
After completing the basic pattern transformation.
Li Yueming started to renovate the outdoor drainage channels.
As I said before, there is an open-air area on the roof of Yan Aunt's house.
·Ask for flowers...
This open-air area gets flooded when it rains.
Because Li Yueming changed the location of the door.
Now the door exit of Yan Aunt's house is located in the open area.
The stagnant water will first of all make it very inconvenient for Yan Aunt's family to go out or go home on rainy days.
This is definitely not okay.
Therefore, Li Yueming also needs to carry out a renovation on the open-air area outside the door.
The stagnant water that originally fell from the open-air area flowed down the drain outside the neighbor's kitchen.
Therefore, if you want to renovate, you have to renovate the walkway outside the neighbor's house in the first phase.
Fortunately, the downstairs neighbors are easy to talk to.
After going downstairs to get consent.
Li Yueming plans to transform this gutter.
This is to provide convenience to Yan Aunt's family.
In fact, it is also convenient for neighbors.
At least when the two parties pass through this open-air area, they don't have to worry about the existence of water on the roof.
First, Li Yueming raised the ground with some granite.
Then, spread out with some White pebbles.
Fill the entire area with pebbles.
Then, in the middle of the pebbles, a granite tread is designed to be stepped on.
This way, even if it rains, the rain will only drip onto the cobblestoned ground.
The granite part can still be stepped on.
Pebbles serve more than just aesthetic purposes.
It can also naturally filter impurities.
In this way, there is no need to worry about the rainwater bucket arranged at the water outlet being blocked.
After doing all this.
Li Yueming also designed a glass screen in front of Yan Aunt's house.
This baffle can be used to keep out the rain.
It is convenient for going out or coming home on rainy days.
Don't get caught in the rain when retracting the umbrella at the door.
And, because Li Yueming changed the exit of the door again.
There is also an area outside the door that can be used for decoration.
Li Yueming chose to plant some anti-mosquito plants inside.
And mixed some common green plants.
These are the expenses picked out of the remaining 30,000 budget.
The renovation of the entire entrance area cost about 10,000 yuan.
Another 20,000 was spent on odds and ends like glass and doors.
In the end, Li Yueming was surprised to find that he seemed to be short of budget.
For the flower beds on the second and first floors, no shelter decorations have been purchased yet.
The budget of 120,000 in hand has already been spent.
(It’s finished, damn it, don’t send me any more reminders!)
(The author lies flat, please let me go!).
sbdcsierra